Project | Description | Why Are We Doing This? | Estimated Effort | Estimated Purchases |
---|---|---|---|---|
New Power For Island [Jana] | Need at least one 220V circuit and 5
Dedicated 20Amp circuits to the Island. These will have
to be pulled from the utility closet at the stairs. At a minimum we need:
|
All power to the Island was cut in the construction. We will not be able to supply internet to the school in the fall with the current power configuration. | Contractor + Permits | $10,000 |
Wireless Bridge For Cafe [Matt] | Install Aruba iAP-175 outdoor access point. Install switch and wireless bridge in cafe. | We don't have a conduit between the buildings. Price is per bridge. | 80 hours | $4,000 |
Cafe POS System [Dawn/Matt] | Purchase and install a POS system for Cafe. Purchase three laptops for staff use. | We will have a new cafe to replace the snack shack. POS system needs to be installed before school starts. Dawn will have a laptop that runs the software and so will her assistant. One backup machine will be kept in the Island. | 40 hours | $5400 (System) $2100 (Sony Laptops) |
New Cabling For Downstairs [Melissa] | Run network cable and install a switch
downstairs. Install access points. This includes
|
Entire downstairs was gutted. Needs wiring replaced. Cisco switch from Kindergarten needs to be re-installed. | 80 hours | $1,000 (Volunteers Price - Supplies Only) |
Google Transition [Matt, Shannon, Jana, Cheryl] | Move to our scvi-k12.org domain for all
mail, calendar, and groups. Some Known SubTasks:
|
Allows centralized mail, calendar and groups. Same system used at High Tech High, Disney, and other schools and business. | 160 hours | $0 |
Upgrade phone System [Elaine, Shannon] | Upgrade existing Cisco 2821 with a new
Cisco 2851 Some Details:
|
Our current system is ready to crumble and at the maximum number or clients. We are growing and our needs are increasing. | 80 hours | $9,000 |
Apple Macbook Air Cart [Shannon] |
|
Laptop cart for Middle School. | 24 hours | $30,000 |
iPad Cart [Shannon] |
|
iPad Cart for Grades K-2. | 8 hours | $15,000 |
New Computers [Shannon] |
|
New Staff, replacement for existing Staff, replacement for missing student computers and new Mac Minis. | 24 Hours | $30,000 |
Drop Box Replacement [Tad Miller, Matt] | Replace our use of dropbox with a Synology
NAS hosted on site. |
We have filed up our drop boxes and need something better. Synology works on computers and iPhones. We can host for multiple iLead sites at SCVi. | 20 hours | $1,000 |
Hallway Music | Play classical music in upstairs hallway - Project was stalled due to concerns with doing it properly | Gives a soothing and inspiring atmosphere - | 20 hours | $600 |
PA System For Downstairs | Run speakers through entire downstairs and hook to existing PA system at front desk | This can easily be done why the school is open and we already have the Amp | 40 hours | $600 |
Wired Conduit To Maui Wowie | Run a conduit to Maui Wowie and install a switch and Access Point | We could do a wireless bridge if we prefer, but a conduit might be cheaper in this case. | 40 hours | $200 |
Lobby TV's | Install 4 TV's in the front of the lobby to stream media | Gives a nice presence when you walk in the building | 8 hours | $1,500 |
Top Of Stairs TV's | Two TV's at the landing on the stairs. This will involve running power to this location | Announcements to see as you walk upstairs in the AM | 4 Hours + Contractor | $3,000 |
Hallway TV | TV mounted on wall in new High School area. | Kim Adam would like a TV to show student work in the hallway upstairs. It will constantly stream student artwork projects as an interactive art display | 4 hours | $500 |
Island Projects | Set up new shelving Set up new tables Clean up Accumulated items |
We want to make daily life in the Island easier. Make more computers available to students | 50 hours | $300 |
Donated Hardware | Catalog, configure, and deploy donated computers | We have many new donated computers and monitors stockpiled in Storage and the Island. We need to get them in the hands of our learners. | 40 hours | $0 |
Inventory System | All computer hardware and other electronics tracked in inventory | We have a good start, but we need to make progress and get everything in the school stickered and added to inventory. | 40 hours | $0 |
Tech Support Tent Cards | A tent card in classrooms explaining how to contact support | Make it clear to everyone how to get help for technical issues | 8 hours | $0 |
Re-Image Macbook Air Cart [Shannon] | Update our laptop image to latest spec then wipe all the macbook airs to the new image
|
Many of the macs were changed and we learned some things during the school year. | 20 hours | $0 |
Broken Macs [Shannon] | Fix broken Macs in Island
|
We have broken laptops and Mac Minis in the Island. All need to be re-imaged and re-deployed. Some may need hardware upgrades | 20 hours | $0 |
Class Web Sites | Work with teachers to get class web sites organized for start of school. | We will have a combination of different sites, Wix, Google Sites, Facebook, YouTube, etc. Teachers need help getting theset tied in to their EdLine landing page. | 80 hours | $0 |
Matt's Tasks | --- | ---- | --- | --- |
Manage This List | Track progress of tasks on this list | I can't do all of this... I need lots of helpers. List will probably move into Pivitol Tracker or Trello to track status of tasks. | 40 hours | $0 |
Document Exit Process | Documentation clearly stating what we do when we exit someone | Folks stick around in email and groups. The steps required by IT staff should be clearly documented. Also document other procedures to be followed by IT staff. | 8 hours | $0 |
New Ethernet Switch | Donated Gig-Ethernet backbone switch needs to be investigated and configured | This could greatly improve our internet backbone if we can figure out how to use it | 4 hours | $0 |
SCVi Technology Web Page | A section on the SCVi home page explaining
technology
|
Communicate our vision and answer basic questions. List opportunities to volunteer. Show this table so folks can pick up tasks. | 20 hours | $0 |
Other Tech Tasks (Probably Not This Summer) | --- | --- | --- | --- |
Wii Smart Boards | Try to get Wii Smart Boards Working | This project was stalled in 2011. Can we make it go now? | 40 Hours | $0 |
Volunteer Hour Transparency | Show top volunteers and each person's volunteer status | There is no recognition for folks that volunteer and no reminders for folks that don't. We need to make volnteer hours fully visible so you can see where you stand and so we recognize those that contribute the most | 40 hours | $0 |
iPhone App | App to show latest events and volunteer hours | An easy portal for parents to know what is happening on the school and see their contributions to voluteer hours and family giving | 200 Hours | $300 |
About Me
- Matt Schnittker
- Santa Clarita, Ca, United States
- I work as a Technology Manager in the Entertainment Industry. My first film was Disney's Dinosaur and have been credited on several films since. I love working on old electronics, especially old radios. I am also passionate about technology and education. I have 4 kids and you can read about us on our family blog.
Wednesday, June 27, 2012
SCVi 2012 Summer Technology Projects
Summer is a time to get projects done at SCVi. There are many projects going on at the school with construction in the building and changes to infrastructure. This page gives a summary of some of the things we'd like to accomplish this summer. Accomplishing this ambitious list will require a great deal of help from our staff and parent volunteers.